ElkwaiSolutions

PROJECT HANDOFF

Preflight & Closeout project reports

The scope, the result and the supporting files. Together.

Collect site observations and installation results in the free workspace. When you need a consolidated handoff, package your own retained records as a paginated PDF, complete source JSON and verified evidence ZIP.

No subscription. Individual survey JSON and printing stay free. Your account and project records remain private.

01 A record someone can follow

01

Readable PDF

Scope, site observations, materials basis, work tasks, acceptance results and open items, with saved-run identities and source hashes.

02

Original evidence

Retained photos and test documents indexed by filename, run, exact file hash and size. Missing or changed files prevent a complete export.

03

Machine-readable trail

Complete source JSON, spreadsheet-safe evidence index and an export receipt identifying the snapshot and generated PDF.

02 One credit. One project.

Project report credit

  • One account-owned project; up to 30 completed site reports
  • Up to 40 retained evidence files and 20 MB attachments
  • PDF, source records, evidence index and attachments in one ZIP
  • Re-export updated retained records during the retrieval window

After purchase, sign in to Preflight, select a project and explicitly assign your purchased credit. No additional payment is taken by the assignment or export buttons.

$19per project creditIntroductory pricing

Assignment cannot move to a different project. Export retrieval ends 30 days from purchase. Source files still expire 30 days from their original creation; buy when your report is ready.

Checking report purchase availability.

Tax at checkout. Keep the downloaded package in your own backups. Review the report package terms, purchase terms and workspace privacy notice.

03 Fits real site work

Network and ISP work

Document ports, rack, service entry, equipment, change tasks and recorded connectivity results.

Wi-Fi and cabling

Keep supplied route measurements, materials calculations, deployment requirements and referenced test artifacts together.

New locations

Carry the survey into an installation scope and reconcile the recorded acceptance requirements at closeout.

Clear limits

Operator-reported records, not independent certification or legal signoff. No installation service, electrical assessment, RF survey, customer approval or recovery of expired sources is implied.